Skip to main content

Field operations / 03

One field system. Everything considered.

Vehicle, trailer, equipment, spare modules, safety provisions and crew are planned as one unit for the field.

Prepare a deployment brief

From the commission to the dataset

Arrive prepared. Return in control.

  1. 01

    Pre-assessment

    Existing documentation, geometry, access, weather windows and safety provisions are checked before the field visit.

  2. 02

    Setup

    Assembly, functional tests, the reference route and retrieval follow a procedure specific to the structure.

  3. 03

    Acquisition

    The route, still-capture sequences, sensor state and anomalies are documented together.

  4. 04

    Handover

    The evidence package, open questions and report are handed over in a structured form to the project team and operator.

Fleet + equipment

Mobile does not mean improvised.

Field logistics are part of technical quality. Systems, cases, power, connectivity and safety provisions have to work together.

  • Labelled equipment cases
  • Redundant power and data paths
  • Structure-specific assembly and retrieval equipment
  • Documented issue and return

Field engineering

People for the last ten per cent.

Automation scales acquisition. Experience solves access problems, identifies inconsistent data and keeps conclusions sound. That is why the team remains visible.

Process and responsibility